400-700-9998
欧美大地 Roads and Bridges Detection
Roads and Bridges Detection
Tangential highway of Bern SHM of the Felsenau viaduct
发布时间:2018-11-23 浏览次数:1320 来源:欧美大地

The total renovation and transformation of the Bern tangential highway between the branch Wankdorf and Forsthhaus, to the connection Bern-Bümpliz was implemented according to philosophy UPlaNS of the Federal Office for Roads Authority as a key project.

The reorganization measures with plan approval process (PGV) lead to increase security of operation and traffic, as well as to homogenize the performance. In addition, the adjustment of the operating and safety equipment and other technical equipment to today’s needs and requirements was made.

 

Number of sensors: 22

INSTALLATION PERIOD TYPE OF SENSORS NUMBER OF SENSORS
2011 – 2013 MuST 22
 

为您推荐